Shaved everything, tray chop, primer paint
head deck and by nines
1/2 inch ODE valves, cohnitech 2 ply bags, 6 inch notch, triangulated 4 link 2 viair compressors 2 5 gallon tanks.
pathys
upgrade and tidy up