chevydime
+1y
im fixing to put my truck in the shop in a few days. I'm getting it done by a guy in the same town. he said it would take about a week to a week and a half to get it done. hes gonna do a wishbone 3-link with panhard bar, 2500lb. airbags, independent bag control, 2 viair compressors and a 5 gallon air tank, with a switchbox, and wheeltubs in the back all for $3,000. just wondering if im getting a good deal wich im sure i am and if thats about the time it should take. thanks for the help in advance