fknlowjeep
+1y
Thanks Cory.
I'm going to be getting the power setup for my garage at our new house soon so I can start buttoning up the chassis finally after almost 2 years. But in the meantime i am picking up my generator from storage tomorrow so i can at least get some of the welding done.
I will be designing and building my new steering rack mounts (in one of the pics above) so i can get that installed next week. Once that's in i will be yanking the 300 out of the f150 and start building the motor and tranny mounts.
I've got almost everything ready to install the rear cylinders, but i'm cutting the tabs i welded to the axle housing off because I want to lower the cylinders so less of them stick out of the floor. I got longer tabs cut for that
I decided on a color for the link bars so will have them coated soon. Once i finish up all the chassis stuff i will probably have the frame coated too.
i am going to get the frame for the floor in the rear started in the next couple of weeks so i can lay some 18gauge on it and get some tubs welded in.
It's been a long time since i've made any real progress but you can count on it that will be happening now.