KEEF
+1y
Edited: 5/1/2010 7:22:54 PM by KEEF
Edited: 9/8/2009 6:34:25 PM by KEEFDime i bagged, tubbed, raised bedfloor and built all metal blower box on then bodyworked before 2 priming/blocking sessions.
water driplet effect
ready for clearcoat, cutting/buffing then bedlining