threads
Page 5 of 12
Build-Ups \  Tre5 Customs...stock floor, IRS, and hydroholics

Tre5 Customs...stock floor, IRS, and hydroholics

Build-Ups General Discussions
views 4640
replies 119
following 57
 
TENONDUBS   +1y

here is a site suggestion how about make a hydrohaulics buid section... badass as usual
Just_Robert   +1y

Sick work!
tre5   +1y


---------------------------------------------Originally posted by TENONDUBShere is a site suggestion how about make a hydrohaulics buid section... badass as usual---------------------------------------------If they did, they would have to spell it correctly... hydrohOlics.  LOL, thanks for the compliment though.
tre5   +1y


---------------------------------------------Originally posted by Just_RobertSick work!---------------------------------------------tough to compare to yours though!!!
CUTSNWELDS520   +1y

MID TERM REPORT ......A+
tre5   +1y
I didn't have a whole lot of time today either, but I managed to get some done.  

post photo
post photo
post photo
post photo
tre5   +1y

The pivots are not done yet. Maybe tomorrow I will have a couple hours to sqeeze in on it. The arms will have the cylinders mounted to them to provide the lift in the rear.
tre5   +1y
Edited: 11/23/2009 8:19:59 PM by tre5

Got some stuff done today. Closed in the ends where the bushings used to be on the sub frame. Put some 45 pieces in the frame for strength. Put a cut out in the crossmember for the exhaust. Closed off the ends of the frame rails under the sub frame. Put an overlay on the niside of the frame rails up front. Ect. Ect. 
post photo
post photo
post photo
post photo
post photo
firefighter5325   +1y


truck should be sic have you had any renderings or anything done 
tre5   +1y

not for this truck. I have one for the Mitsu that is just about wrapped up.