threads
Page 1 of 3
Build-Ups \  Corrupt Silverado

Corrupt Silverado

Build-Ups General Discussions
views 1759
replies 21
following 15
 
Corruptcustoms   +1y
Edited: 11/8/2010 6:32:30 PM by Corruptcustoms

This is my first build thread on here hope everyone likes it.

This is a 2002 Silverado excab we got in trade, it wasnt in driving condition and was pretty rough.

Plans are a sfbd 3/4 underslung frame , cantilever type 2 link, Aluminum fuel cell, and new control arms for 24





Autocad drawing of our plans.



trucks&stuff   +1y
sweet!!
bigjon   +1y
looks like a great start!
Fnlow69   +1y
Looks good so far man, keep the updates coming...

Justin
Corruptcustoms   +1y
Radius corners





post photo
post photo
post photo
smctoy   +1y
damn...sic build!
Corruptcustoms   +1y
Full lift is at about 10"





post photo
post photo
bill brasky   +1y
looks good. I like it.

Who did the cad drawing for you?
Corruptcustoms   +1y
The owner of the shop/truck also does autocad drawings for metal buildings so it came in handy to have those drawn up before we made a cut.

Were hoping to slide the new frame under the cab tomorrow and start mounting things. Also move on to the front where im sure we'll have cad drawing of the new control arms. He plans to narrow the track width and have a good amount of turning while 1"-2" off the ground.

So far this has been a 13 day build and I think we've made good progress.