threads
Page 4 of 22
Build-Ups \  MMW Crew Cab C10 Project

MMW Crew Cab C10 Project

Build-Ups General Discussions
views 9792
replies 219
following 94
 
whataberger   +1y
looks good taylor...small world...saw your truck on its way...didnt realize it was yours at the time..i live in north texas and saw that blue cab over at a gas station a block from my house and stopped to check it out..looked like an onld custom with the turned sideways plate and weird graphics. i woulda tagged that ho, had i known it was yours lol. anyways looks real nice. keep it up.
jeebus @ mmw   +1y
haha, thats weird, yea you couldnt miss that damn semi, it was a custom from the 80s lol


thats damn crazy that you saw it tho, it is a small world!



Taylor


solows10   +1y
amazing cant wait to see it at CnD
sparage   +1y
Fab work looks great. Like said before, I can't wait to see what you do with the front.
jeebus @ mmw   +1y
the brake lines were useless, so i replaced them with some stainless braided ones. And going to run new lines to each wheel as well. The fronts on these things are tricky, i had to machine up a new mounting system for them, it works much easier now.

Also a couple shots of the interior, i forgot to post any.

This weekend will bring a whole slew of updates, so stay tuned.

still waiting on wheels............................ They said 2 more weeks, 2 weeks ago..... yea its like that. :(



post photo
post photo
post photo
post photo
zms2004   +1y
nice taylor. i might go to camp n drag this year. ill definitely have to check this out.
zms2004   +1y
Edited: 2/28/2011 8:06:31 PM by zms2004

damn internet. double post.
jeebus @ mmw   +1y
well, im going to have to change my wheels its looking like.

I was originally told by centerline that it would be 2 weeks tops.

Called today to get a tracker, and it looks like 6 more weeks.... maybee.


Any suggesgions? I cant afford billet unless someone can score them for under 700$ per wheel, which i dont see possible.


Taylor
tlw32882   +1y
good ole centerline..... talk to milo. I doubt ordering a set of billets is going to save you much time though.
Reyna_Bros   +1y
What size are you looking for Taylor, I can have you some Racelines made in about 3 weeks depending on the size, let me know what your looking for. Also I am re doing the rear brake set up on the C10 where can I score me some lines like those and the brackets???