threads
Page 1 of 1
Nissan Trucks \  86 1/2 to 97 Hardbody and 86 1/2 to 95 Pathfinder pillar pod group order.

86 1/2 to 97 Hardbody and 86 1/2 to 95 Pathfinder pillar pod group order.

Nissan Trucks Make Specific
views 869
replies 0
following 1
 
alabama_lowlife   +1y
Hey guys, some of you may know me from InfamousNissan and several of the nissan forums of the past. The guys over at NPORA(Nissan Pathfinder Off Road Association) have been trying to get up enough people who are interested in buying a 2 or 3 gauge pillar pod for the hardbody or pathfinders so that we can get them custom made by http://www.gaugepods.com/. The minimum order for them to do this is 20. We currently have about 20 people who have said they are interested, but if we can get more people the price will be lower. If you are interested, we'll all have to pay before they start production. But once this first order is done, the pillars will be available for order from their website. Please reply to this thread or at infamous http://www.infamousnissan.com/forum/showthread.php?t=19489 or at NPORA http://npora.ipbhost.com/index.php?showtopic=31242&st=0

Here's the info from their website.

"Attention car clubs and Internet forum groups. We can manufacture custom gauge holders for your vehicle. Prices starting at just $20 for single pods. Full-length pillars as low as $39.

Minimum order quantity as low as 20 per project. Some models may require a higher minimum. All projects must be paid prior to project start. Pricing will be determined after receipt of OEM part for evaluation. Most of our products range from $40-$60 ea. depending on complexity.

REQUIREMENTS:

Name, address, and contact information of project leader. Follow-up will be with project leader only. (Please do not have others call for status)

OEM part from project leader. This will be used for fabricating the mold and is non-returnable.

Make, model and year range specifications.

Color samples (at least 4"x4" sample) of all colors to be painted.

Gauge Size requested (usually 2 1/16" and/or 60mm). Note: some models may not accomodate 60mm gauges due to width limitations.

PRODUCTION SCHEDULE:

Rough mock-up will be made and sent to project leader. Project leader test-fits mock-up - checking for clearance problems and angle of gauges. Project leader returns the mockup with any modifications and approves the design.

Mold-making process - approx 1-4 weeks

Initial production run - approx 3-4 weeks

Finishing and shipping - approx 1 week after product availability.

*******IMPORTANT********

PRODUCTION SCHEDULING IS COMPLEX AND DELAYS ARE NOT UNCOMMON DUE TO THE NUMBER OF PROJECTS AHEAD OF YOURS, MATERIAL LEAD-TIME, ETC. WE DO OUR BEST TO PROVIDE A RESONABLE ESTIMATE OF DELIVERY TIMES - HOWEVER, WE CANNOT GAURANTEE A DELIVERY DATE."
Page 1 of 1