nvrtolo4me
+1y
ok guys do i need to run a drop spindle on the front to layout a squarebody? if so i know i will have all the stuff the convert over the the 3/4 ton stuff in the front so do i get spindles for a 3/4 ton then? and which ones do you guys run?
thanks