more pics!
the Z is 95% done. the top inside of the frame needs to be capped to make sure no water gets inside .
i went ahead and put some 2 inch x1/4 inch plate on the bottom of the frame. grinding my brand new frame on pavement doesn't sound very good to me. plus, it moves my control arms a little farther from the ground when its layed out.
im thinking about painting my frame a semigloss black...
i cut 1 of my lower arms so far..
i replaced the tie rod boots with Brand new polyurethane ones. the upper and lower ball joints have new red boots as well...the tie rods etc.. were sanded down and painted .the steering box is next.
the guy i bought it from replaced all the steering and suspension parts under the truck not to long ago... one less thing i had to pay for..
i flipped the frame back over and smoothed the welds down .