I think it would be better to build a frame jig so you could make that perfectly level and build the frame off that and be easier than trying to work with the old frame. I plan on building one like this when I start my frame build:
Also is there any reason your using 2x4 tubing instead of 2x3? 2x3 will get you 2 inches of drop and is plenty strong.
Post was last edited on Jul 26, 2007 01:43. Edited 1
time.