threads
Page 10 of 26
Mazda Projects \  backhalf [5/18/08]

backhalf [5/18/08]

Mazda Projects
views 54439
replies 255
following 53
 
robbie   +1y
more pics from today.

thread post photo

thread post photo

thread post photo

thread post photo

thread post photo

thread post photo

thread post photo

thread post photo
madmazda   +1y
You got a point there....lol
madmazda   +1y
^^^^^^ How hard was it to Re-angled your upper balljoint, and explain the process please....i believe thats what you did in the pictures above, (June 22 update ones)
robbie   +1y
I cut the control arm like this.
thread post photo

then bolted the control arm back on and attached the balljoint and spindle, then put the wheel on and jacked it up until it was where it needed to be then put a few tacks to hold it in place then let it back down to make sure it would still lift up enough then welded it up. Its welded and plated on the backside and welded on the top and ground down.
slammed83mazda   +1y
why did you shorten your control arms for?
robbie   +1y
I didn't shorten them. I changed the angle of the upper balljoint because they were binding up before I laid out.
slammed83mazda   +1y
ahhhhhhhhhhhhhhhh
bagdb2200   +1y

which causes the awesome negative camber when laid out...mine does the same thing
madmazda   +1y


Ah, alright, Thanks Robbie.
robbie   +1y
All I like now is actually welding in the upper bag bracket and plumbing and wire it up.

thread post photo

thread post photo

thread post photo

thread post photo

thread post photo

thread post photo