Login
Register
threads
rides
market
More
Events
Gallery
Calculators
Wiki
Store
Login
Register
Login
Login
Register
Threads
Rides
Market
Events
Gallery
Calculators
Wiki
Store
Login
Register
Browse
threads
Page 2 of 2
Mazda Projects
\ Had her for 2 days here is the progress so far
Had her for 2 days here is the progress so far
Mazda Projects
views 3098
replies 18
following 14
pont
+1y
thay have a spray for it called side molding adhesive remover lol really though
and nice truck man reminds me of my 2nd Mazda is yours a 86 mine was looked just like that just not as good
blare
+1y
A Grinder!!!! O noessssssssssss
mark
+1y
i think the side moulding gives it character. matches the bumper chrome trim
projekt94 (david)
+1y
nice truck man. bag that bitch!!!!
d16ej1
+1y
im going to heat up the moldings first to see it all the goo comes off with it if not i'll use the rubber wheel here at work we use it to take off pinstripe with. Oh and no the truck it a 89 and the air bags are coming soon i hope lol
thetornado
+1y
looks great bro. what all did u do to lower it?
slammedmini469
+1y
d16ej1
+1y
4 inches of block in the rear and cranked the torsion bars for now and cut down the bump stops
luke
+1y
I wish I could do that in two days...
Prev
Page 2 of 2
First
«
Previous
1
2