dragn92nznsi
+1y
last night we notched the frame out on both sides for the re-7s, and reworked the LCAs. we cut the tops off so there was only 1 inch sticking up, and we're plating it with 1/4 inch. then we welded 1x1 3/8 inch wall along the flat parts (following the contour)... makes it way beefier. now that we cut the control arm down, the upper bag mount will be below the frame, and the uppers we make wont have to be so big to clear the mounts. ill upload pics later