threads
Page 2 of 5
Mazda Projects \  juicedmazda under construction again

juicedmazda under construction again

Mazda Projects
views 3373
replies 45
following 11
 
juicedmazda   +1y
thanks alot guys it will be 12 days before i can work on her again got to work 12 12hr days sucks ass i got the tank on but fr got to take pic iwill do that first thing when i start back on her
devb22   +1y
Looks good man...


Dev
toddluck   +1y
how hard was it to raise the bedfloor?
juicedmazda   +1y
not bad we raised the bed floor after we dune the back lol should of raised it first then dune the back the floor that was in the bed was rusted bad so we put in another bed floor out of a parts truck i had
toddluck   +1y
cool cool
juicedmazda   +1y
5inch's was removed
toddluck   +1y
cool cool
v8mazda4ever   +1y
nice work so far bro hope to see more soon.
juicedmazda   +1y
what i got dune thursday
thread post photo

thread post photo

thread post photo

thread post photo

thread post photo
dropped90(justin)   +1y
damn thats alot of bridge lol.




-justin