Login
Register
threads
rides
market
More
Events
Gallery
Calculators
Wiki
Store
Login
Register
Login
Login
Register
Threads
Rides
Market
Events
Gallery
Calculators
Wiki
Store
Login
Register
Browse
threads
Page 9 of 11
Mazda Projects
\ UPDATE: Project: I think I'm Turning Japanese
UPDATE: Project: I think I'm Turning Japanese
Mazda Projects
views 10868
replies 108
following 38
mazdalowandslow
+1y
Just drilled some holes in the cab on the right side. The truck has a se metric firewall.
mazdalowandslow
+1y
So it's been a little since ive updated.
front tubs are in and seam sealed, im currently working on fully seam sealing the cab and under coating it before finishing the from firewall.
Heres a few pics.
paparoach1983
+1y
looking good so far
b2000freak
+1y
looks like your getting close to your deadline
mazdalowandslow
+1y
Yea, im sweating it. I would really like to get this thing done before the good weather comes out in seattle.
immortal1 (linn)
+1y
Tubs look good! Look forward to seeing some shots after you get it drivable
v8mazda4ever
+1y
Ya tubs look great but what about the bed thought you got the metal to finish it.
mazdalowandslow
+1y
ack! i forgot to throw up thoes pictures. I see about getting them up tonight.
paparoach1983
+1y
cool cool
mazdalowandslow
+1y
Here is the sheet steel bed.
Prev
Next
Page 9 of 11
First
«
Previous
7
8
9
10
11
»
Next
Last