threads
Page 9 of 11
Mazda Projects \  UPDATE: Project: I think I'm Turning Japanese

UPDATE: Project: I think I'm Turning Japanese

Mazda Projects
views 10868
replies 108
following 38
 
mazdalowandslow   +1y


Just drilled some holes in the cab on the right side. The truck has a se metric firewall.
mazdalowandslow   +1y
So it's been a little since ive updated.

front tubs are in and seam sealed, im currently working on fully seam sealing the cab and under coating it before finishing the from firewall.

Heres a few pics.



paparoach1983   +1y
looking good so far
b2000freak   +1y
looks like your getting close to your deadline
mazdalowandslow   +1y
Yea, im sweating it. I would really like to get this thing done before the good weather comes out in seattle.
immortal1 (linn)   +1y
Tubs look good! Look forward to seeing some shots after you get it drivable
v8mazda4ever   +1y
Ya tubs look great but what about the bed thought you got the metal to finish it.
mazdalowandslow   +1y
ack! i forgot to throw up thoes pictures. I see about getting them up tonight.
paparoach1983   +1y
cool cool
mazdalowandslow   +1y
Here is the sheet steel bed.