well i finally got a chance to do some work on the truck.the biggest and hardest thing to accomplish was rebuilding the engin x member which after drawing it out and a LOT of planning it actually turned out to not be so hard to do. i made a lot of progress considering i only worked on it for about 3 hours.
getting ready to start on it
notched the tubing for the lower control arm mounts. this took fooorrreeevvveeerrr since i had to use an angle grinder.
mocking it up and measuring it out.all i have to do now is cut and weld the tubing to connect it to the frame.i will have it finished with more pics tomorrow IF the weather clears up.