threads
Page 27 of 42
Mazda Projects \  PROJECT:- SETBACK

PROJECT:- SETBACK

Mazda Projects
views 31380
replies 414
following 51
 
immortal1 (linn)   +1y
SHARP lookin rims!!!! Given those numbers you should not have any problem tuckin.
jmzcustomz (jeff)   +1y
Looking good man. Real good.
dropped90(justin)   +1y
correct me if im wrong but you didnt tub any of the firewall because your running those small pathies. i got 17s and i know id have to do some tubbing if i were to bd. maybe im lookin at the picture wrong or missed something. just a thought man.





-justin
mazdawg(mikey)   +1y
yeah hes right i had to tub mine slightly. you dont have to cut the whole thing out, just cut a small section where the original tub meets the firewall.
sleepyspeed   +1y
yep I will have to do that little spot, but not worried about it just yet.
sleepyspeed   +1y
okay got a little free time tonight so I started on ver. 2 of the lower control arms. Found out my air comp. can't run a sand blaster to save it life though
thread post photo


oh this set is a step cleaner than the last set, notice the sway bar mount tab completely gone
thread post photo
sleepyspeed   +1y
yeah look the bag collapses perfectly up front now. I have to make a very, very small notch in the frame rail so the top convolute of the bag can sit normally. hoping to get the other side tomorrow.

thread post photo
toddluck   +1y
lookin good man
toddluck   +1y
imma have to send that york now
paparoach1983   +1y
lookin good bro