dragn37   +1y
( thiers no tension YET on the brake line, so dont pin point that out to me, im replacing all the braking stuff so it doesnt matter anyways)
crazymikey   +1y
that is one of the cleanest mazdas ive ever seen. you should have put it in a time capsule.


But that wouldn't be as fun as bagging it now would it?! haha
dragn37   +1y
Haha Thanks, hopefully front will be bagged in 1 week or so
dragn37   +1y
Ok a little update: got both sides out, now just waiting for bags to come to size up where im putting the brackets! Pictures will follow after tonight.
91b2200(cody)   +1y
pics?
dragn37   +1y
Sorry its been raining here for awhile.. a little update: 2moro i will have the one whole side done. Then ill start on the next side.

Plans for the back: Reverse four link.
dragn37   +1y
Ok, one whole side done!! Thier is a few things to adjust/e.c.t. but u get the idea!

--cut the control arm just incase extra clearence
--Top bag bracket welded in, support arms also
--custom support Bracket
--bottom bag bracket also welded in/reinforced into the lower control arm. And a few little modifications we did along the way!



dragn37   +1y
I lost the whole saturday(yesterday) due to the freakin rain, Oh well though
dragn37   +1y
Bump
slammedyota91   +1y
Looks really good man, The welds on that upper plate dont look very strong though, Might just be the pic, either wayGreat start!