threads
Page 9 of 12
Mazda Projects \  PROJECT: DIRTY DAWG: 87 B2000

PROJECT: DIRTY DAWG: 87 B2000

Mazda Projects
views 12126
replies 119
following 16
 
skrapinsask   +1y
Im feeling that blue color, looks like its all coming together nicely!
87bbucket   +1y
heres a long awaited update. heres some parts first
thread post photo

thread post photo

thread post photo
87bbucket   +1y
here what u really been waiting for .
thread post photo

thread post photo

thread post photo

thread post photo


heres how she sits i need to go a little lower
thread post photo
hunterw   +1y
sexy lookin motor and clean ass engine bay! it was worth the wait lol
mazdaman82   +1y
oh hell ya that looks good man
bgdb26k   +1y
lookin good man!
87bbucket   +1y
Thanks for all the comments it keeps me motivated to keep my head high and get'r dun. I got the radio in and then the rain came so got to wait til tuesday to work on her again. Got all the fluids in so when the plug wires show up I can crank it.

thread post photo

thread post photo

thread post photo
paparoach1983   +1y
looking good man
87bbucket   +1y
i finally got a whole day with no rain so i finished up the front cutting, so when i order the bag brackets i just got to weld them in. i also did a ball joing flip. well here somee update pics.
thread post photo

thread post photo

hes after it all together it sits about 1" lower now.
thread post photo
hunterw   +1y
sweet man you are gonna be draggin in no time