threads
Page 18 of 30
Mazda Projects \  Draggin' Meat

Draggin' Meat

Mazda Projects
views 19877
replies 292
following 35
 
fastonthetrack   +1y
yeah that would be crazy with all 4... it would fill pretty quick. I also have a sanden already converted just need the mounting brackets. so all 4 and and EDC would fill 7 gallons in like 15 seconds.
hunterw   +1y
that would be awesome. just so you know. when you run the edc...put the check valve on the tank. since it is so close to the ehaust the seals get fried and air will leak back through your edc. it gets hot
fastonthetrack   +1y
great advice, ill make sure i do that. im starting to run out of room, i need to mount at least one water seperator still and the 2, maybe 4 compressors.
fastonthetrack   +1y
also as soon as i get a road test out of the rear end, the following weekend i will bag the front.
hunterw   +1y
nice! cant wait to see the whole truck layed out. yeah i made the mistake of putting my check valve right off the edc and burnt em up real quick lol

,
if you are doing a header i would wrap it in that ceramic tape stuff or paint it with ceramic paint. it helps a ton, especially if you run regular dot hose closeto the header
fastonthetrack   +1y
yeah i already put a pacesetter on there and painted it in ceramic paint.. so im one step ahead.
fastonthetrack   +1y
ok so heres some pics.. you can see that i cant lay out because 1. my driveline hits the x member. 2. tires hit fender wells.

thread post photo


thread post photo


thread post photo


thread post photo


thread post photo


thread post photo


thread post photo




And my sweet asss ford flex rental from work

thread post photo
toddluck   +1y
lookin sexy man
fastonthetrack   +1y
Check this BS out... WTF???

How do i fix this issue other than getting bigger wheels?

thread post photo
skrapinsask   +1y
you might have to rock spindles! some one correct me if im wrong