threads
Page 7 of 11
Mazda Projects \  project TUCNB2200 is underway~new pics of system 11/10~

project TUCNB2200 is underway~new pics of system 11/10~

Mazda Projects
views 13423
replies 107
following 15
 
mazdaman82   +1y
well good...that what we like to hear....glad you didn't do it if it was that bad...
tucnrim   +1y
blue looming all my wires under the hood, got 20 feet of it.. lol Looking better by the minute..
toddluck   +1y
pics man pics
tucnrim   +1y
before:
thread post photo

after:
thread post photo

thread post photo


also got the diamond plate out of my bed so I can start marking lines for the body drop and do some body work
tucnrim   +1y
Tomorrow I am going to see if I can find some high heat blue to redo my valve cover, oil cap, radiator cap, and a few other items. mark the bed for the 3 inch drop, finish up the new sub boxes possibly.
toddluck   +1y
looks good man
bgdb26k   +1y
yea man, thanks for the info on the tank!! thats plenty of clearance with the truck laid out. good luck on your truck thats a nice project for you!
tucnrim   +1y
thanks, I am very happy with it Cant wait to get the rocker on the ground...
tucnrim   +1y
Airline from the edc to my tank blew a small hole, how I dont know. It is secured and doesnt rub or isnt by any sharp edges. good thing i have my dc-07 as a backup . Going to have a hydro fitting pressed on later this week. I am getting rid of the blue lines and going to get a new fitting pack and lines, possibly a few new valves as well
paparoach1983   +1y
sucks about the main line but hey your looking good wither way