95lowtide
+1y
**UPDATE**
Day....whatever:
well this past weekend we did all the electrical, mounted the tank, mounted the compressor, water trap, adjustable pressure switch and valves. picture below:
a little info on the setup:
the 2 yellow hoses are 5/8" line (which btw is a bitch to cut) that comes out of the chrome 5 gallon 4-port tank and into the main valve inlet which is located under the tank, and goes out via 3/8" valves with 1/2" air lines that are going to be attached to the valves once the air line plumbing is done.
all thats left is weld the bag mounts in for the front (which are gonna be custome fabbed) and the rears ones welded on as well as the bridge and run the line. also the gas tank is going to be moved into the rear part of the bed because once i lay out the truck, the gas tank wont drag and get a hole in it. anyways, probably another weekends worth of work and the truck is done being bagged!!
thats it! stay tuned for more!!!!