Edited: 1/21/2009 7:04:55 PM by draggingbody
.. few updates. 32 days total workin on the truck so far as of 1/21/09 it runs drives shifts and stops. got the fuel, brake and clutch systems all working 100% stock hood with edc in stock ac location we got my new site up and running also has a much better store setup and we can start putting up pics of all the vehicles we work on. check it out.
www.krisdyefabrication.com