TwistedMinis
+1y
Edited: 6/18/2008 12:33:53 PM by TwistedMinis
Well I signed the lease for the new shop today, got some keys and opened it up. I'm going to have the electricity turned on today, and it will get wired for all my 220 stuff this Sunday. The following week I need to get some work benches built. I have a 3x8 top with breaks in it, 1/8" thick for a table along the back wall. Along with my TIG table, the welders and drill press. Then I get to start moving stuff in, and pretty soon build a new frame table. I'm excited. This means I get to start on the frame for my 30 soon.
I'm going to have an open house the third week of July, with free food and free soda.
Also won't be taking any new orders for a while. Gonna be busy.