tre5
+1y
I am working on it. Nothing to really take pics of though. I have the fronts suspension 100% back on, the rear suspension 100% back on, the gas tank up in it's home and 80% plumbed, and I need to do the brake lines on the rear axle. I still need to sheet metal the firewall and all of the rear, plus the drive shaft tunnel. Then comes the hydraulics. I am planning a 2 pump with a wammy tank. The dumps will be plumbed remotely, kinda like Brandon's car. 4 Kinetik 1800's for the hydraulics. Oh yeah, I still need to put all the sheet metal back on up front, mount to more Kinetik 1800's under the hood, and also all the other wires and nonsense unde the hood. A lot of work to get done in less than 2 weeks!