threads
Page 16 of 51
Build-Ups \  Project: NIGHTSHIFT -- Bagging my 09

Project: NIGHTSHIFT -- Bagging my 09

Build-Ups General Discussions
views 14563
replies 500
following 122
 
bagged_02   +1y

are you serious why it looked so good and so much work went into it
LaidNeon   +1y
tonight we finally got the truck turned around. tomorrow we get it level again & start ripping apart the front end
post photo
federal20   +1y
funny thing is the back has more lift now then it will ever get when we get done with it lol
LaidNeon   +1y
So tonight we tore apart the front end. Potter went ahead & cut off the unneeded metal from the frame while Rob plated the inside of the rear frame. Tomorrow i think the guys are going to build the lower control arms....
post photo
post photo
post photo
post photo
IMLOWER   +1y


. 
downforce   +1y


---------------------------------------------Originally posted by LaidNeonfinally started hanging the rear section!! still have a bit more work to do & then we can start on the link bars & the bolt-on bridge



--------------------------------------------- There is a ghost in this picture!
post photo
LaidNeon   +1y
finally dropping off the axle tomorrow to get narrowed
22below   +1y

Looking good!
tre5   +1y

I am glad you cut all that unnecessary tube work out of there, it looked way too busy.
boooghar   +1y

i was wondering why all that tube work  was in the corner of the shop when I stopped by friday night - LOL