threads
Page 17 of 51
Build-Ups \  Project: NIGHTSHIFT -- Bagging my 09

Project: NIGHTSHIFT -- Bagging my 09

Build-Ups General Discussions
views 14568
replies 500
following 122
 
baggedblue75   +1y
---------------------------------------------Originally posted by LaidNeonSo tonight we tore apart the front end. Potter went ahead & cut off the unneeded metal from the frame while Rob plated the inside of the rear frame. Tomorrow i think the guys are going to build the lower control arms....---------------------------------------------theres something about that first picture that gives me a hard ooops.i love seeing a new truck torn apart and cut up.great work guys i cant wait to see it laid out.
post photo
post photo
post photo
post photo
AON-OFFDAHOOK   +1y
I am also glad you are redoing the rear end.  This truck is pure class and tube work in spaghetti-style fashion was way too tacky for what this truck is.  Just my opinion of course...
LaidNeon   +1y
wait til you see what we have instore. Probably wont reveal it til after its powder coated & back on the freshly painted frame
tre5   +1y

as long as it doesn't look anything like what was in there....
federal20   +1y
wwwwooooooooowwwwwwwww lol
LaidNeon   +1y
Earlier in the day we dropped my axle off with Pyle Bros to get narrowed 10". Tonight potter almost completed the LCA for the passenger side. These are 3" shorter then stock. I went a head & honed out the lower ball joint mount on the drop spindles. We will be flipping the lower ball joints using Chevy Ball Joints
post photo
post photo
post photo
post photo
bagtodrag   +1y
Bitchin Dan, Bitchin!
lowrthnu92   +1y


---------------------------------------------Originally posted by tre5I am glad you cut all that unnecessary tube work out of there, it looked way too busy.--------------------------------------------the tube work is bolt on
IMLOWER   +1y

.
federal20   +1y
man finaly a day off