threads
Page 2 of 8
Build-Ups \  Project "Low Path"... 94 Pathfinder 4dr.......chassis done 2-7-12

Project "Low Path"... 94 Pathfinder 4dr.......chassis done 2-7-12

Build-Ups General Discussions
views 2490
replies 72
following 39
 
tlw32882   +1y
i have a feeling this is going to be sick!
idrgbdy   +1y
nicely planned. looks like you've got just about everything to build it in a long weekend. lol
pugz   +1y
lol. its gonna take a lil longer than jsut a long weekend. hahahaha. if it was a truck that might be the case.  btu damn 4 dr suv's can become a bitch.
pugz   +1y
he found alot of stock frame dimensions from a nissan crash book. and then he used that along with measurements he took from the actual truck and designed all the frame from there.
McClarys   +1y
---------------------------------------------Originally posted by Pazz88mazdaEdited: 5/17/2010 6:09:28 PM by Pazz88mazdaNice ride man i can't wait to see more.!!!   Im sorry if this is a stupid question.. Is this all drawn out buy hand? or did you find it somewhere ?   --------------------------------------------- some of those are from a collision frame book i had...  but they only have the bodymount locations and certain frame points locations on them... so i went to photoshop and drew the frames out and took ALOT of measurements from the pathy truck and Nissan truck..    
post photo
waynehammer   +1y

lol i like the way it looks like its all drawn out on napkins. hahaha.. thats how i get down... lol
ilo00w   +1y

fuck yes! have been waiting to see 2 door pathy done for a long time!! cant wait...
tuckinlugs06   +1y

its not a 2 door just looks like it
xgolferdude   +1y


yup its a 4 dr....

pugz   +1y
ya its a 4door.  the rear handles on pathys are up on the pillar.   should have some more updates soon.