threads
Page 2 of 3
Under Construction \  C10 BackHalf Build-Up

C10 BackHalf Build-Up

Under Construction General Discussions
views 3594
replies 25
following 12
 
tuckinlugs06   +1y
im pretty sur the flat tube at the bottom of the loop is geting but out when he is done
DisseveredCustoms   +1y
--------------------------------------------

TuckingLugs05 said:

im pretty sur the flat tube at the bottom of the loop is geting but out when he is done

--------------------------------------------

Yep the flat section between the small driveshaft hoop bars will be cut out. Im just keeping it in for now till I have both lower tubes connected.
DisseveredCustoms   +1y
Edited: 10/18/2010 7:49:05 PM by DisseveredCustoms

Well here is my progress today. Still got alot more to do but at least all the tubing before the axle is in!!!

reallybigbellyboy   +1y
looks great, stay on it.
DisseveredCustoms   +1y
--------------------------------------------

reallybigbellyboy said:

looks great, stay on it.

--------------------------------------------

thanks Jarrod, It should be done next week if all goes as planned
DisseveredCustoms   +1y
Well I havent updated this thread in a while due to the fact that all I have been doing is welding and grinding the frame. But now the frame is fully welded, cleaned up, and sealed and pressure tested. So here are some detail pics of it before I started putting it back together.

























Here are the reworked upper 4-link bars.





And here is the hidden grease fitting for the sway bar, there is one on each side of the frame.



I should have soom pics of the back half assembled today. Then it is off to the owners house to meet up with the rest of the frame!



post photo
post photo
post photo
post photo
post photo
post photo
post photo
post photo
post photo
post photo
post photo
post photo
post photo
post photo
post photo
DisseveredCustoms   +1y
Well here are the pics of the backhalf assembled. The last pic shows the lift i am getting. It s just a little over 13 inches of lift when the shocks and swaybar lock out. The backhalf is actually welded and gusseted to the truck frame. But I keep forgetting my camera since it is at the owners house now. i am currently waiting for the owner to get the bed put back together and mocked in place so i can build the rest of the tubing for the bed mounts, bumper mounts, and make battery and compressor trays. Anyway on with the pics and tell me what u guys think please i feal like this thread gets no luv..LOL







post photo
post photo
post photo
post photo
weave   +1y
From what I can see looks pretty clean.

My computer crapped out and I cant see the pics from the last few posts but keep it up man.