threads
Page 4 of 7
Build-Ups \  4 door 98 blazer 22 and 24's bodydroped

4 door 98 blazer 22 and 24's bodydroped

Build-Ups General Discussions
views 5439
replies 61
following 16
 
4drbdblazer   +1y
got the engine mocked in and the tranny. Building the mounts next. Then the 2 link :)
mrbarky   +1y
Did the shop that had it start that giant tub mine is no where near that big. Progress is looking good by the way

post photo
4drbdblazer   +1y
they cut the tubs out. I wanna get the engine mounted and driveline in before I start the tubs. My tub will be all the way to the rear side window to clear the 24's. Not looking forward to tubing the doors.
4drbdblazer   +1y
got the 5.7 mocked in this weekend. Need to build some engine mounts then I can start the rear link.
4drbdblazer   +1y
Took most the day to clean their garbage welds and jigsaw welded pieces of metal up but it looks much better and will actualy stay attached driving down the road. Next will be the framing for the floor. Once body is mounted to frame I'll start the rear tubs and rear link.