StockfloorYota
+1y
Edited: 11/3/2011 2:27:07 PM by StockfloorYota
Edited: 11/3/2011 2:26:26 PM by StockfloorYota
Edited: 10/26/2011 3:30:58 PM by StockfloorYota
Sorry I don't have some cool nickname for my truck, I think those come from them actually seeing daylight.
Specifics-2x3 custom built frame from firewall back-3/8 lift valves with some size smaller dumps, making them really slow and dramatic like-Slam RE series bags. 6" fronts, 7" rears.-Dual 480s pumping into (2) two 480 viair compressors. What it desperately needs-Fresh primer-Clean/Polish wheels-Start to organize/polish the engine bay a bit-Core support and front tubs of some sort built
Major things needed: -New trans tunnel, current one doesn't allow for seats to slide forward-New bed build, similar design, higher quality work-Reshave the doors and put my lock cylinder back in the door to pop open the drivers door
I have no sponsors so everything is out of pocket and i just graduated last year so things are slow. Progress will be made though.
This is how it sits as of now...
Annnnnd, this is the road it took getting there.
Air tank position, one hangs below it too.
The front half of the trans tunnel needs changing a l[
Parked under a buddies same model truck
Lift door, obviously needs bracing
Annnd....back to right now.