Well had a good weekend.. THe back is all finished.. Just gotta bolt on the wheels and tub the bed. Should be 100% finished by the time my arms get here tuesday.. Here's some pic's...
Rear axle all painted and assembled..
New drive shaft extended 3 1/8"
Wishbone crossmember all finished
Tank Crossmembers
Welded up all the holes
Building a hitch
Hitch installed
Lil etching primer
Tanks mounted
Started plumbing the valves while we were waiting on paint to dry
Gettin ready to bolt it all together
Axle,4 link and wishbone installed
7 wire cable for the valves and sending units in the rear
Wires all fished thru
No wires
Rear valves installed and wired
Crossmember in and bags installed
Wishbone at full lift.. Shows how much it'll slip.
Tanks all plumbed
Airhose coupling
Finally plumbed
Now just need to anchor it.
That was it when I left.. HE was gonna finish the plumbing for the front to the valves and anchor it all.. Then start the engine driven compressor bracket.
Whatcha guys think?