So its back, ive been holding off on updates since we will be taking it to tex mex. This pic is from tuesday....
Ontop of all the bed sheetmetal we ditched the nitrogen for an 8gal and dual 480s. Were also relocating the front valves, replacing the bags with newer ones, adding trainhorns, building a 50gal fuel cell that will go in the "toolbox" alonng with a relocated battery. Also on the list is replacing the bottom of the frame from all the dragging damage, upgraded wiring for the valves, rebuilt throttle body with 90lb injectors, smoothed gooseneck bridge w/something special planned, and mabey some interior work too.