Thanks man! i got the bake line done yesterday evening. havent posted it yet. im ready to set the bad on and see where i need to trim at.
and that is 1/2" stainless steel tubing. and i built that little junction point on the frame with just some pipe threaded collars a piece of flat strap metal. im wondering if i should run both independently off seperate valves or if i shoud just tie them togather on one valve. i have 1/2" valves. it lifts pretty fast now even with just a little schrader valve stem.