75dually
+1y
I actually got several things done on the dually today. First of all I got the bed frame work completed (finally...). You can take off the bed sides and the front part of the bed and the framework remains in place. I also got the wheel arches cut out today as well.
My driveshaft is supposed to be done by mid week. So that will allow me to figure out what I will need to do with the bridge over the driveshaft.
So I went out to the donor Suburban and robbed the gas tank door. Below I finished the filler neck and the breather tube install. I will make a box that will hold the filler tube and mount to the gas door. Then I will start the sheet metal that will cover the rear of the bed and incorporate the fuel door. Should be interesting...
A couple more items ticked off the list... I really want to get this beast turned around and start working on the front end!