got to work on the sled today , im starting to think ill never finish this f!@#$%ing thing!!! pulled the motor back out to mate it to the trans, started figuring out my shift cable brackets and made a mount for the kick down cable, also started fitting the new airbags in the front got new upper bag plates..
motor out...soo sad
got the 47rh bolted up to this hog
close up of the kick down cable and shifter cable bracket
got my new denso starter installed yay
this is a pic of the new upper bag plate had to make sure the bag would clear , the old one blew out and truck went off the road and almost wrecked...i dont call him evil bill for nothin..
had to lengthen some of the slots to put the bag in the right spot..
://i126.photobucket.com/albums/p87/jbelain/DSC04017_zpsafbce2fc.
used the old upper plate on the bottom of the a arm and used 1/4x1 flat bar to box it up...ready for sandblasting and paint