threads
Page 4 of 26
Mazda Projects \  backhalf [5/18/08]

backhalf [5/18/08]

Mazda Projects
views 54421
replies 255
following 53
 
robbie   +1y
you have to figure out the wiring oh and you have to buy a trailer wiring converter that makes a 4 to 3 wireing connection.
robbie   +1y
Just got this in the mail today. Brand new iwata lph-400 I work in a bodyshop for a ford,nissan,mazda dealership so it will mainly be used there but I'll paint my truck with it.

thread post photo

thread post photo
robbie   +1y
What I'm fixing to be doing. Bags and valves should be here any day.

thread post photo

thread post photo

thread post photo
mazdaboom   +1y
nice work!
robbie   +1y
Got my Z's valves and bags in header will be here tomorrow.

thread post photo

thread post photo
down2earthdawg   +1y
looks like sombodys gonna be switch happy in a couple of days
drag that shit hard bro truck looks awsome
robbie   +1y
Little more progress. Dump bed hinges are mocked up and almost ready to go. Still have everything to bag the front just need time and a 220 plug so I can plug in my welder.

thread post photo

thread post photo
thetornado   +1y
nicccccccccce! cant wait to see it. make sure u let us know when u get taht done
2fine89   +1y
Good looking hinges - can't wait to see it together.
robbie   +1y
Flipped my balljoints, my new chrome grill came in and it fit just like the old oem one and I finally got my 220 extension cord made so I can start welding up a storm.

thread post photo

thread post photo

thread post photo