threads
Page 12 of 13
Mazda Projects \  Project: OUT CAST (Update - 8/22/07)

Project: OUT CAST (Update - 8/22/07)

Mazda Projects
views 22278
replies 127
following 33
 
laydoutb26   +1y
i basically wanted to do it for the stamped mazda logo
slammed83mazda   +1y
I disagree, over a period of time it may not be weeks months but in a year or so it probably will. Think about how much your bed twists and such, we get at least 10 vehicles a month that have shaved gates or skins and they never brace them correctly or cap them and they start to crack.

I would take 15 mins outta your time and brace the corners from your gate to your bed. Just trying to save you time from down the road.
mazm   +1y
shave those bed seams while your at it man, i like the look of the mazda stamped in the tailgate
madmazda   +1y
Cool...Keep us posted.
speedster93b   +1y
lookin pretty clean dude. when you bagging the back?
laydoutb26   +1y
baggin the back as soon as i get the dough. i got a guy from vertically challenged, my ex truck club prez, that has 2 slam re8s and 4 1/2" blitz valves that he is sellin me for 150 for all. the valves are 25 each, and the bags retail for like 150 each or some shit... so i'm gettin a GOOD deal. 400 retail for everything and i'm only payin 150. My front bags will be for sale soon, i'm jumpin up to re7s in front.
speedster93b   +1y
why the switch to re7?
slammed83mazda   +1y
those bags run for like $75 a piece bro lol, your looking at the 600psi version.
laydoutb26   +1y
all slam bags on the RE version retail for 75. these were teh old version that retailed for 140 ea.
dropped90(justin)   +1y
what kind of bags you runnin on the front? how much you gonna want? pm me when your ready to sell. im startin to put together my bag parts.