hrm ok... me have no welding skills and dont see it coming in the future so im looking for somethign to bolt-on if i can with my current,old,ugly,shitty setup ;p
its currently running 2600lb bags over the axle, mono-leafed with notches already there (so i think the main welding part is done for a linkage...?)
yes i know im gonna have fun with this frame and have my fall tied up with it.... it was a big joke what i found under the bed when i removed it (air parts on accessable from the bottom)
2 manual M.I.C valves
5 gallon 1-port! tank
2 thomas comps
3/8" line all the way around
2500lb front bags and 2600lb rears
the tank and manual valves was th ebfunniest....WAYYYY outdated as you can tell hehe
im planning on....after i decide on the link
RE-7's on all 4 corners
change manual valves to 8 electric
5 gal 8 port slim tank
viar 450 comp or maybe (2) 380s....not sure
1/2" lines
3 guages! (not havign guages blows)
me i look at it and think a 3-link bolt-on from SD will work maybe even 5-link. but the notches is what has me thinking, would i have to just go ahead and get them took out and inster a new bridge in its place to run the 3/5-link correctly? getting that done is not a big thing and/or if needed placing the bags in different locations (which i dont see a huge reason for) i just prefer something quick and simple like a SD bolt-on or road grater