So another day and some more work done here are some pics with the drop spindles going in.
Here is the new lower ball joint in.
And here is the spindle in place.
Had to get new upper ball joints the nice thing is that the new ones have a zerk fitting to grease them.
Here is how high it is up into the fender well so far I need another 1 1/2 inches to make sure it will lay frame hard.
and here is how much I have so far cut out of the wheel well. I all have lost is the widshield bottle so far I am going to get some small rubber molding to put around the hole to clean it up a little
Here I am starting to get the rest of my drop by removing the bottom part of the frame and then open up the lower control arm abit.
I have decided to use one bag in the back and put it right over the pumpkin it is big enough to lift the back and more.
It's just alittle bigger than the re-7 but I will need to get the port opened up to a 1/2 port.
Na just kidding but it is a big bag thou.