threads
Page 10 of 59
Mazda Projects \  Project P.O.S. Mazda

Project P.O.S. Mazda

Mazda Projects
views 121478
replies 583
following 123
 
flameds10(tyler)   +1y
put in aboiut 8 hours on the underside of the bed today, basically got it all sheeted, jus one last small strip left to do, it is all sheeted with 18 gauge, plugged welded and the stich welded along the sides,
heres some pics

thread post photo


thread post photo


thread post photo
badchicn (rick)   +1y
Wow, this thing is really turnin' out bitchin'! I love the chop...
mazberrydelight   +1y
yesterday i finished the last of the metal work on it , estimate i have around 800 hours of welding, and fabrication in it . today we start the fiberglass interior then its paint time finally
flameds10(tyler)   +1y
ok, so Devin and I did some moroe work on the truck yesturday, the metal work is now pretty much done, got the underside of the hood shaved unfortunatly i forgot to take so pics of it. We also started on the interiour. we got the sterring column mounted some most of the wiring figured out, got the doors put back on, started on the door panels, and started mapping out a dash.

thread post photo


thread post photo


thread post photo


thread post photo


thread post photo
v8mazda4ever   +1y
awsome work bro now I really can't wait to get back on mine and get some serious work done on it.
speedster93b   +1y
is that an ididit column?
flameds10(tyler)   +1y


Flaming River
speedster93b   +1y
nice. do you mind if i ask how much it was? i like it a lot. i am trying to decide between ididit and flaming river... goin for a simple tilt only column
flameds10(tyler)   +1y


it was about 500$ its a tilt column, i also got the swivel mount which was another 80$
flameds10(tyler)   +1y
its the polished coloumn, the paintable ones are cheaper i believe, i think the ididits columns u can get in chrome