Started to lay out some tubing.
Had a custom drive shaft made, that goes from Nissan flange, to Spicer clip yoke, to Toyota flange.
These look a little phallic at the moment, but it will make sense soon.
I am borrowing a tube notcher tomorrow, since mine has not showed up, so that I can build the 4-link, and get it TIG welded.
So while I have that notcher I am going to notch the tubing for your wishbone Marcus. That way I can FINALLY get it done. I ordered mine 3 weeks ago..