Project Drag Star (Pg. 21 Finished)
twisted minis avatar
twisted minis
+1y


The large hole on the left has a tube welded in it for the exhaust to pass through. The rest are dimpled for strength.
blastation avatar
blastation
+1y
pm sent seth about bars.
twisted minis avatar
twisted minis
+1y
I got it. You don't really need to post about sending PMs. Thats what PMs are for.
elbine69 avatar
elbine69
+1y
Any new updates?
twisted minis avatar
twisted minis
+1y
Its uhh, turkey day. I don't work. Lol. I am working tomorrow.
twisted minis avatar
twisted minis
+1y
I have a lot of shit to do in about 3 weeks. Lol.
thread post photo


Carrier Bearing crossmember.
thread post photo

thread post photo

It will sit .125" off the ground laid out, so bolt heads on the bottom = no bueno.

And heres whats going on under the truck.
thread post photo


I finished installing the 2x3 rails today, and everything is tacked in. Its still rough, but that will change. Tomorrow = lots of grinding and welding. And I still have to box the transition at the front, which is why its open still.
slammed83mazda avatar
slammed83mazda
+1y


You doing all this with the cab on? Is it like barely lifted off the jacks or what?
twisted minis avatar
twisted minis
+1y
Yes everything is being done with the cab on. Its bolted in place. Helps keep the frame aligned a bit when cutting it up. But I also had cross braces under the frame where the cross members where, and I still have some on the back half to keep everything straight. Its pretty simple, just takes time.
slammed83mazda avatar
slammed83mazda
+1y


Sounds awsome man, this is really up my alley far as what I will do if and when it comes time to do the 83.
twisted minis avatar
twisted minis
+1y
Just make sure you have about 8 jackstands.