threads
Page 2 of 11
Mazda Projects \  project TUCNB2200 is underway~new pics of system 11/10~

project TUCNB2200 is underway~new pics of system 11/10~

Mazda Projects
views 13420
replies 107
following 15
 
mazdaman82   +1y
wow!!!! i welded on my bag once but that was to temp fix a crack in the plate, but i retiped it,that shit is nuts rights there
tucnrim   +1y
I just got a JVC Everio HDD Video camera so I will be able to get videos of my truck and better photos... Gonna try it out later after it is charged up.
mazdaman82   +1y
get cam working yet...pics?
paparoach1983   +1y
an well i am gonna ask too man
tucnrim   +1y
Yes it been a few days since i updated.. so here we go:

Video of my air tank, Mounted under the cab. custom made, sits where the gas tank used to be:
thread post photo


also a few pics of the truck with my phone while bored at work.. lol:
thread post photo

thread post photo

thread post photo

thread post photo
tucnrim   +1y
I got video of my rear set-up:
thread post photo
tucnrim   +1y
Not the best video, but is ok, shows some of the outside and inside of truck:
thread post photo
tucnrim   +1y
I'd like to get back on the subject of the bag that was replaced.. I have video of it now..
thread post photo
mazdaman82   +1y
hey you know what you should call it ..tucr
tucnrim   +1y
snapped pics just now.. so on to them.:

front down, rim shot:
thread post photo


thread post photo

side shot angled:
thread post photo


Mazdaman82 you wanted to know how low the gas tank was so here are a couple shots, also a couple of the sending unit:
thread post photo

wanted something to show size, so an oil bottle it was, it sits off the ground i say 7 inches or so.. so no worries man on it dragging:
thread post photo


thread post photo

thread post photo

thread post photo


my engine bay.. needs a lot of work and some finishing on things as well:
thread post photo

thread post photo