Plans changed today, didnt work on the truck at all. But heres some pics from yesterday. Might go start plumbing the valves tomorrow depending on how work goes.
thread post photo

thread post photo

thread post photo

thread post photo

thread post photo

thread post photo
dat dood   +1y
Lookin good!
frocashmoney24   +1y
its really starting to come together, i did the valves last night. The paint has ATON of candy in it, but you cant see because of the shitty pic and not the right light. Gonna do the wheels the same red. Maybe get this thing aired up this week! Lots of plumbing to do!
elbine69   +1y
Nothing too exciting but got the brakes done on it last night, compressors are wired, 9 wire cable for the valves is run too. Hopefully the fittings I am waiting on show up today or tomorrow, possibly get this out of the garage this weekend. Pics later.
baha   +1y
Can't wait for pics, it's coming out really nice! Nice work guys.
elbine69   +1y
Thanks Baha!
dropped90(justin)   +1y
haha









-Justin
elbine69   +1y
Everything is pretty much finished. Need to hook up the switchbox and pressure switch and run the air lines to the gauges. Going to work on it right meow. Pics:
thread post photo

thread post photo

thread post photo

thread post photo

thread post photo
skrapinsask   +1y
Starting to look dialed!
elbine69   +1y
thread post photo


Finished wiring this morning and lifted it off the blocks under its own power this afternoon. Ripped out at least 50 feet of random hacked up wiring from under the dash in the process too. Need to track down an air leak and run one more gauge line because I ran out of 1/8" line. Its running rough from a vacuum leak, probably from welding on the front suspension, but in the process of trying to find the leak we discovered a AA battery taped up and shoved in one of the bigger lines. Interesting to say the least.