threads
Page 9 of 10
Mazda Projects \  OldSchool's 92 B2200i Rebuild

OldSchool's 92 B2200i Rebuild

Mazda Projects
views 14857
replies 95
following 13
 
mymmeryloss   +1y
Are you going to be running a topper?
oldschool   +1y
yes sir...hinged one
mymmeryloss   +1y
Ok cool
dealwithit   +1y
i think it would be neat with a somewhat clear top, so you can see all the cool detail work you've done.
oldschool   +1y
I just got my crank and block back yesterday from the machine shop.....Now for the assembly process...Where did I put those bolts?.....



thread post photo







thread post photo
oldschool   +1y
Getting new fenders in place....I got to seam seal and lay down some paint under the hood then we can install my newly rebuilt 2.2 power plant...lol




thread post photo





thread post photo
oldschool   +1y
Got my newly rebuilt engine back under the hood and she is running and doing awesome....we are on the 2nd oil change.....I have to do a lot more dressing under the hood but I am pleased.....Hard air lines and stainless steel brake stuff is next on the horizon......


thread post photo







thread post photo
mymmeryloss   +1y
Looks great
dealwithit   +1y
thats sweet man, the flat black looks awesome love seeing gm wheels tucked on 2wd sheet metal