threads
Page 8 of 10
Mazda Projects \  OldSchool's 92 B2200i Rebuild

OldSchool's 92 B2200i Rebuild

Mazda Projects
views 14856
replies 95
following 13
 
oldschool   +1y
Well while the block, crank, rods, and head is in the shop for cleaning and machining I thought I would dress the engine bay up a little...I have to pick up some trailer fenders as well...I relocated the wiring harnesses to the area between the inner and outer fender..I removed what seemed like POUNDS of grease..lol....I got some painting done...I am thinking about Steel braided brake lines to attach at the calipers.....


thread post photo





thread post photo





thread post photo






thread post photo
oldschool   +1y
Found some chrome inside releases and painted some pieces black...


thread post photo






thread post photo







thread post photo
mymmeryloss   +1y
Y not run the airline down the frame? That looks kinda janky to me...
oldschool   +1y
We are going to re locate the valves more than likely but I am NOT putting them down on the frame so they are hard as hell to get to if you had an issue...I like to think of it from a service aspect...
low_life77   +1y
Looking good man nice progress!
mymmeryloss   +1y
Interesting
oldschool   +1y
It Just Feels Right was Mazda's slogan in the 90s when my baby came off of the assembly line....thanks guys.....As soon as my black tweed gets here I am going to finish wrapping the Lauan panels in the bed and do the rest of my raised lettering and design work.....