kdcgrohl
+1y
So, I'll admit it, been totally slacking since like November, barely even touched it except for a couple small things, so here's the big update.
Fluids filled with royal purple.
Vacuum lines ran and vsv's relocated to the side of the valve cover on stainless plate.
LC Engineering big bore throttle body installed. Bead blasted my lower half so they'd match.
All the bolts/screws in the throttle body and the linkage stuff were powdercoated.
And I added a bunch more pike nuts. You can see a couple big 'uns on the upper control arms. Those things are addictive...