Been a while since an update..
rear setup just about done
I am having gussets for the bars and lower bag plates cut on the water jet. Then all that i really need to do is cut the ends of the 4 link crossmembers straight and cap em off, and mount the shocks
I think im doing a canti setup with the shocks.. Because the area between the notch and the bars going from the straright bar notch to notch, and the cups, Looks way to empty. so that should fill it up..
Im working on the gas tank brackets right now. smoothed out the rear frame rails, and started making the tank bracket.
Also picked up some rims..
18" neeper DAGGs with tires on ebay for $180. They were local too so i didnt need to pay shipping..